What is BIM?

Technology is remodeling the means that buildings and infrastructure area unit designed, made, as well as operated. It’s furthermore serving to enhance decision-making and performance across the building and infrastructure lifecycle. BIM is a model-based method that gives the insight to assist you to propose, design and also construct projects. It furthermore helps to manage the buildings and infrastructure and now is the trend of 7D BIM.

The people who can take advantage of BIM are:

  1. FACILITY MANAGER
  2. OWNER
  3. GENERAL CONTRACTOR
  4. ARCHITECT
  5. STRUCTURAL ENGINEER
  6. DETAILER
  7. MECHANICAL ENGINEER
  8. FABRICATOR
  9. SITE MANAGER

Implementation of 3D to 7D BIM:

Source: AXD Studio (7D BIM)
Source: AXD Studio (7D BIM)

3D BIM OR the way to COMMUNICATE the planning intent

3D BIM – constant quantity information in an exceedingly cooperative model

BIM revolves around academic degree integrated data model from that varied stakeholders like Architects, Civil Engineers, Structural Engineers, MEP System Engineers, Builders, Manufacturers and Project householders. These people can extract and generate views as well as knowledge in line with their desires.

The concerned person then collects correct information on the project life cycle and holds on to the Building Information Model.

4D CAD OR WHAT HAPPENS TO THE SCHEDULE just in case of PROJECT CHANGES.

SCHEDULING

The construction sites coming up with connected activities implement 4D-BIM. The dimension of BIM permits participants to extract and correspondingly visualize the progress of their businesses.

The utilization of 4D-BIM technology may furthermore result in improved management over conflict detection or the complexness of changes occurring throughout a construction project. 4D BIM provides strategies for identically managing and visualizing website standing info, modification impacts similarly as supporting communication in varied things like informing website employees or warning regarding risks.

5D CAD OR WHAT HAPPENS TO the value just in case of PROJECT CHANGES.

ESTIMATING

The construction projects implement 5D-BIM for budget pursuit as well as price analysis connected activities. The fifth dimension of BIM related to 3D and 4D (Time) permits participants to see the progress of their operations and also the related prices over time.

The utilization of 5D-BIM technology may result in higher accuracy together with a sure thing of project’s estimates, scope changes, and materials, instrumentality or forced changes. 5D BIM provides ways for extracting and analyzing prices, evaluating situations together with changed impacts.

6D CAD OR the way to OPTIMIZE THE ENERGY CONSUMPTION.

SUSTAINABILITY

The construction industry widely makes use of 6D BIM. It refers to the intelligent linking of individual 3D CAD elements or assemblies with all aspects of project life-cycle management info.

The 6D model is sometimes delivered to the owner once a construction project is finished. The “As-Built” BIM model is inhabited with relevant building element info like product information and details, maintenance/operation manuals, cut sheet specifications, photos, assurance information, clear links to online product sources, manufacturer info together with their contact information. This information is formed accessible to the users/owners through a made-to-order proprietary web-based surrounding. This can be meant to assist facility managers within the operation as well as the maintenance of power.

7D CAD OR a way to MANAGE ASSETS LIFE CYCLE.

FACILITY MANAGEMENT

7D-BIM (seventh-dimensional building info modeling) is employed by managers of the operating and maintenance departments. The seventh dimension of BIM permits participants to extract and track relevant quality information like part standing, specifications, maintenance/operation manuals, assurance information, etc.

The usage of 7D BIM may come to an end by replacing the drum sander and faster components, optimized compliance and an effective quality lifecycle management over time. 7D BIM delivers the processes for managing the information of subcontractor/supplier and facility part through the complete facility life cycle.

Benefits of BIM:

3D BIM

  • Enhanced project visualization, improved communication
  • Improved multidisciplinary collaboration
  • Rework reduced to a greater extent

4D BIM

  • Optimum planning
  • Optimized construction activities
  • Better team coordination

5D BIM

  • Much efficient, cost-saving, and sustainable projects

6D BIM

  • Reduced levels of energy consumption

7D BIM

  • Asset management at optimized levels

Final words

BIM is promising and more advantageous as compared to the conventional processes. In spite of some minor setbacks, the technology is still given top priority.

A significant amount of development is necessary for information flow as well as inoperability of software.

Additional training material is needed for training purpose to learn the complicated aspects of BIM. Hence, many universities in India are coming forward to train students in this field.

Share your views!

 

By bimengus

BIM Engineering US is a leading Building Information Technology solution service provider offering end to end solutions in Mechanical, Electrical, Plumbing and Fire Protection systems engineering, design and construction.

Leave a Reply

Your email address will not be published. Required fields are marked *