Blog

5 quick wins to inhibit prevalent construction scheduling setbacks.

In an endeavor to help  level down on administrative tasks and enhance project communication, this blog acts as a comprehensive guide to help you deliver…

  •   By bimengus

  •   October 23, 2020

Top reasons why Architects and BIM professionals should upgrade their Revit version to 2020

Revit has been a game-changing software or BIM authoring tool for AEC professionals, and it has progressed significantly since 2002. The 2020 version provides new…

  •   By bimengus

  •   October 4, 2020

How BIM adoption enables proactive Facilities Management

Abstract BIM influences the complete lifecycle of a project viz. realization, operations, and facilities management. Operations and facilities management can contribute to maximum expenditure. The…

  •   By bimengus

  •   September 20, 2020

Rethink cost estimation with core processes that drive 5D BIM

With the adoption of Level 3 BIM, cost estimation can be adopted through 5D. This is possible by linking the 3D model to an estimation…

  •   By bimengus

  •   September 17, 2020

Top 8 Technologies for Construction Risk Management.

Any business comes with its fair share of risks, but controlling risks in construction is at a different level. The reason being, there’s a myriad…

  •   By bimengus

  •   September 9, 2020

Using Navisworks to save time and money with Improved Co-ordination.

There are various benefits of Building Information Modeling (BIM); in an MEP department, the majority of the projects are modeled in Revit. Often, other project…

  •   By bimengus

  •   August 26, 2020