Amidst a society driven by technological demand, the construction sector is far from exempt from these demands. Along with shorter timelines, owners need to control…
By bimengus
July 2, 2021
Current practices to capture field conditions are manual and tedious, and often accompanied by inaccurate data. This leads to costly rework and project delays. Whether…
By bimengus
June 10, 2021
Construction vision is changing the landscape of onsite construction. This technology allows onsite construction personnel to measure and analyzes objects in real-time and real life.…
By bimengus
May 25, 2021
Leverage better BIM value with improved collaboration meetings and enhanced project management. Are you reaping the true value of BIM through modern collaboration processes, technology,…
By bimengus
May 17, 2021
Navisworks is a powerful tool to implement during the design stage. An uncoordinated 3D model with thousands of clashes can be a nightmare for BIM…
By bimengus
May 14, 2021
The adoption of digital twins will continue to unlock digital workflows for various construction projects. Reality capture serves as a great tool with complete digital…
By bimengus
May 5, 2021
When existing facilities require remodeling or redesign, the need to document true As-Built conditions is important. Laser scanning is a powerful tool for Architects, General…
By bimengus
April 29, 2021
Failure to evaluate, control, and mitigate risks creates serious complications. Technology is consistent, and that’s one way to manage a myriad of risks in construction.…
By bimengus
April 26, 2021
Summary Automating the BIM process helps project stakeholders like project managers, owners, and others save on time & money. The early stage of construction or…
By bimengus
March 7, 2021
Abstract BIM influences the complete lifecycle of a project viz. realization, operations, and facilities management Operations and facilities management can contribute to a maximum expenditure…
By bimengus
December 16, 2020
With the adoption of Level 3 BIM, cost estimation can be adopted through 5D. This is possible by linking the 3D model to an estimation…
By bimengus
September 17, 2020
Any business comes with its fair share of risks, but controlling risks in construction is at a different level. The reason being, there’s a myriad…
By bimengus
September 9, 2020
The key for facilities management (FM/3D BIM model) is about the power of storing information. It concerns about assets and several locations. 3D laser scanner will…
By bimengus
November 24, 2017
© Copyright © 2017 Bimengus.com, All Right Reserved